​Floating Engineered Hardwood Flooring

- Jan 05, 2021-

Floating Engineered Hardwood Flooring

Step 1:Install the first row using wood glue on all plank ends, arranged with the tongue facing the center of the room. 


Step 2:When installing additional rows, work from left to right. Apply wood glue to the tongue and groove seams, then connect the pieces, carefully folding and tapping the new piece to rest on the subfloor. Immediately wipe up any glue that squeezes through the boards.  


Step 3:Measure from board (not tongue) to wall and subtract the expansion gap to know the correct cut for the last row of boards. Then, insert the last row of flooring, taking care to leave the proper extension gap between the last piece and the wall. 


Step 4:Remove the painter's tape after 8-10 hours, but avoid heavy foot traffic and furniture placement for 24 hours.  


Step 5:Once your new floor is complete, install transition pieces and remove the spacers. Then nail the baseboards and shoe mouldings to the wall, not the floor.   


Good to Know:Use small pieces of painter's tape randomly over each new seam to secure your work as you move. This provides additional stability to the floor as the glue dries.